Apr 12, 2020Leave a message

Disassembly Steps Of Tower Crane

1. Lower the fishing hook, remove the fixed end of the lifting rope, and retract the reel with the wire rope.

2. The lifting trolley is retracted until the boom heel is fixed, the luffing rope is retracted into the drum, and the luffing mechanism cable is removed.

3. Remove 3 balance weights.

4. Remove the boom.

5. Remove the last balance weight.

6. Remove the balance arm.

7. Disassemble the driver's cab.

8. Disassemble the top of the tower.

9. Disassemble the fixed section of the upper turntable and the slewing mechanism.

10. Disassemble the fixed section of the turntable and the slewing mechanism.

11. Demolition of the tower body: remove the tower body according to the reverse procedure of erecting the tower body.

12. Remove the chassis.

13. The dismantled tower crane components are decomposed and transported away from the site as required.

1 QTZ6018 Construction Hammerhead Tower Crane


Send Inquiry

whatsapp

skype

E-mail

Inquiry